| Preparatory stage — demolition works | |||
| Floors | |||
| 1 | Dismantling of board floors with joists | sq.m | 120 |
| 2 | Dismantling of cement-sand screed up to 50 mm | sq.m | 150 |
| 3 | Dismantling of cement-sand screed up to 100 mm | sq.m | 250 |
| 4 | Dismantling of floor tiles | sq.m | 150 |
| 5 | Dismantling of parquet | sq.m | 120 |
| 6 | Dismantling of skirting boards (PVC) | lin.m | 20 |
| 7 | Dismantling of glued linoleum | sq.m | 60 |
| 8 | Removal of old underlay, hardboard, plywood | sq.m | 60 |
| 9 | Removal of waterproofing (per layer) | sq.m | 40 |
| 10 | Dismantling of skirting boards (wooden) | lin.m | 25 |
| 11 | Removal of linoleum (unglued) | sq.m | 50 |
| 12 | Removal of carpet | sq.m | 50 |
| 13 | Dismantling of board floors | sq.m | 150 |
| Walls, partitions | |||
| 14 | Dismantling of facade plaster or pebble dash | sq.m | 200 |
| 15 | Removal of plaster from walls | sq.m | 150 |
| 16 | Removal of plaster from walls with reinforcement | sq.m | 220 |
| 17 | Removal of old wall filler | sq.m | 80 |
| 18 | Dismantling of reinforced concrete walls, thickness up to 8 cm | sq.m | 1500 |
| 19 | Dismantling of reinforced concrete walls, thickness up to 16 cm | sq.m | 2000 |
| 20 | Dismantling of reinforced concrete walls, thickness up to 21 cm | sq.m | 2500 |
| 21 | Cutting openings in slabs and concrete walls | point | 500 |
| 22 | Dismantling of ceramic tiles | sq.m | 200 |
| 23 | Dismantling of asbestos-cement board walls | sq.m | 120 |
| 24 | Dismantling of walls 1.5 bricks thick | sq.m | 800 |
| 25 | Dismantling of walls 1 brick thick | sq.m | 600 |
| 26 | Dismantling of walls 1/2 brick thick | sq.m | 300 |
| 27 | Dismantling of gypsum plasterboard (GKL/GKLW) partitions | sq.m | 240 |
| 28 | Dismantling of lightweight concrete partitions | sq.m | 260 |
| 29 | Dismantling of gypsum plasterboard wall cladding on a metal frame | sq.m | 100 |
| 30 | Dismantling of gypsum plasterboard wall cladding on adhesive | sq.m | 150 |
| 31 | Removal of wallpaper from walls | sq.m | 50 |
| 32 | Cleaning walls of water-based paints | sq.m | 60 |
| 33 | Cleaning walls of oil paint | sq.m | 200 |
| 34 | Dismantling of wall lining of boards, lining boards, PVC panels including frame removal | sq.m | 120 |
| Ceiling | |||
| 35 | Dismantling of suspended gypsum plasterboard ceilings | sq.m | 150 |
| 36 | Dismantling of suspended slat ceilings | sq.m | 70 |
| 37 | Dismantling of Armstrong-type suspended ceilings | sq.m | 50 |
| 38 | Washing off water-emulsion coating | sq.m | 80 |
| 39 | Dismantling of stretch ceilings | sq.m | 70 |
| 40 | Removal of ceiling tiles | sq.m | 60 |
| 41 | Removal of oil paint from the ceiling | sq.m | 250 |
| 42 | Dismantling of ceiling coving | lin.m | 50 |
| 43 | Raking out ceiling cracks | lin.m | 80 |
| 44 | Cleaning plaster from the ceiling | sq.m | 180 |
| 45 | Removal of wallpaper from ceilings | sq.m | 70 |
| 46 | Raking out ceiling concrete joints (seams) | lin.m | 80 |
| Windows and doors | |||
| 47 | Dismantling of door units | pcs | 400 |
| 48 | Dismantling of window units | pcs | 500 |
| 49 | Dismantling of window sills (concrete) | pcs | 200 |
| 50 | Dismantling of window sills (wood) | pcs | 150 |
| 51 | Dismantling of architraves | lin.m | 40 |
| 52 | Cleaning window and door reveals of plaster | lin.m | 140 |
| 53 | Cleaning window and door reveals of old paint | lin.m | 100 |
| 54 | Dismantling of metal doors with frame | pcs | 800 |
| Finishing works | |||
| Floor installation | |||
| 1 | Backfilling expanded clay under screed with levelling | sq.m | 180 |
| 2 | Laying of wooden joists | lin.m | 250 |
| 3 | Installation of dry prefabricated GVL floor (floor element) | sq.m | 400 |
| 4 | Installation of cement screed up to 25 mm | sq.m | 280 |
| 5 | Installation of cement screed over 25 mm | sq.m | 320 |
| 6 | Installation of reinforcing mesh (for cement screed) | sq.m–lin.m | 80 |
| 7 | Floor levelling (self-levelling compound) | sq.m | 250 |
| 8 | Waterproofing, 1 layer (roll) | sq.m | 150 |
| 9 | Waterproofing, 2 layers | sq.m | 200 |
| 10 | Vapour barrier installation | sq.m | 60 |
| 11 | Floor insulation with thermal insulation | sq.m | 70 |
| 12 | Laying of chipboard on the floor | sq.m | 250 |
| 13 | Laying of solid wood boards | sq.m | 900 |
| 14 | Plywood subfloor with fixing on dowels and mastic | sq.m | 220 |
| 15 | Installation of board floors | sq.m | 400 |
| 16 | Laying ceramic floor tiles on a prepared surface with grouting on adhesive | sq.m | 600 |
| 17 | Laying granite floor tiles | sq.m | 850 |
| 18 | Laying of engineered parquet boards | sq.m | 420 |
| 19 | Sanding of parquet | sq.m | 250 |
| 20 | Scraping of parquet | sq.m | 220 |
| 21 | Varnishing of parquet in 3 coats | sq.m | 180 |
| 22 | Laying linoleum (dry) | sq.m | 200 |
| 23 | Laying linoleum (glued) | sq.m | 240 |
| 24 | Laying commercial linoleum | sq.m | 280 |
| 25 | Laying laminate | sq.m | 320 |
| 26 | Laying decorative laminate | sq.m | 360 |
| 27 | Installation of cork board floors | sq.m | 450 |
| 28 | Laying carpet (dry) | sq.m | 240 |
| 29 | Laying carpet (glued) | sq.m | 280 |
| 30 | Installation of skirting boards (hardwood) | lin.m | 160 |
| 31 | Installation of skirting boards (PVC) | lin.m | 120 |
| 32 | Varnishing of skirting boards | lin.m | 60 |
| 33 | Painting of skirting boards | lin.m | 120 |
| 34 | Installation of a threshold | lin.m | 200 |
| Walls, partitions | |||
| 1 | Brickwork (facing with joint pointing) | pcs | 14 |
| 2 | Brickwork (rough) | pcs | 12 |
| 3 | Erection of partitions from straight gypsum tongue-and-groove boards | sq.m | 600 |
| 4 | Erection of partitions from foam concrete and aerated concrete blocks | pcs | 60 |
| 5 | Erection of partitions from glass blocks | sq.m | 1000 |
| 6 | Installation of plaster mesh on the wall | sq.m | 100 |
| 7 | Sealing joints with gypsum mortar over serpyanka tape | lin.m | 120 |
| 8 | Installation of insulation (mineral wool, foam plastic) | sq.m | 100 |
| 9 | Installation of gypsum board or moisture-resistant gypsum board partitions with insulation (1 layer) | sq.m | 400 |
| 10 | Installation of gypsum board or moisture-resistant gypsum board partitions with insulation (2 layers) | sq.m | 600 |
| 11 | Wall cladding with gypsum board on a metal frame | sq.m - lin.m | 280 |
| 12 | Wall cladding with gypsum board on Perlfix adhesive | sq.m - lin.m | 260 |
| 13 | Installation of gypsum board or moisture-resistant gypsum board boxes (2 faces) | lin.m | 400 |
| 14 | Installation of gypsum board or moisture-resistant gypsum board boxes (3 faces) | lin.m | 580 |
| 15 | Installation of gypsum board or moisture-resistant gypsum board boxes (4 faces, column) | lin.m | 760 |
| 16 | Installation of curved gypsum board boxes (2 faces) | lin.m | 560 |
| 17 | Fabrication of a gypsum board arch | pcs | 1500-5000 |
| 18 | Installation of sound insulation | sq.m | 150 |
| 19 | Installation of vapor barrier | sq.m | 120 |
| 20 | Wall cladding with lining boards including frame installation | sq.m | 360 |
| 21 | Wall cladding with decorative panels | sq.m | 340 |
| 22 | Wall cladding with cork covering | sq.m | 400 |
| 23 | Cladding of wooden walls with chipboard or plywood including frame installation | sq.m | 380 |
| 24 | Installation of plastic, MDF, or Exopan on the wall | sq.m | 260 |
| 25 | Insulation of walls and partitions | sq.m | 100 |
| 26 | Installation of a ventilation grille or access hatch (bathroom, built-in cabinet) | pcs | 250 |
| 27 | Installation of a wooden batten frame | sq.m | 200 |
| 28 | Cladding with wooden lining boards | sq.m | 380 |
| Ceiling installation | |||
| 1 | Installation of slat / panel ceilings in the bathroom | sq.m | 400 |
| 2 | Installation of a suspended gypsum board ceiling (1 level) | sq.m | 340 |
| 3 | Installation of a simple-shape suspended gypsum board ceiling (2 levels) | sq.m | 460 |
| 4 | Installation of a simple-shape suspended gypsum board ceiling (3 levels) | sq.m | 580 |
| 5 | Installation of a complex-shape suspended gypsum board ceiling (2 levels) | sq.m | 600-5000 |
| 6 | Installation of a complex-shape suspended gypsum board ceiling (3 levels) | sq.m | 800-10000 |
| 7 | Installation of an Armstrong suspended ceiling | sq.m | 200 |
| 8 | Installation of a Grigliato suspended ceiling | sq.m | 280 |
| 9 | Installation of a stretch ceiling with an area of less than 6 sq.m: | sq.m | 1400 |
| 10 | Installation of a stretch ceiling with an area from 6 to 12 sq.m: | sq.m | 1000 |
| 11 | Installation of a stretch ceiling with an area from 12 sq.m: | sq.m | 800 |
| 12 | Ceiling insulation with insulating material | sq.m | 200 |
| 13 | Sound insulation | sq.m | 180 |
| 14 | Ceiling cladding with lining boards including frame installation | sq.m | 400 |
| 15 | Installation of a glass-mirror ceiling | sq.m | 550 |
| Painting and plastering works | |||
| 1 | Plastering of brickwork up to 3 cm (on guides) | sq.m | 300 |
| 2 | Plastering of brickwork over 3 cm (on guides) in several passes | sq.m | 380 |
| 3 | Plastering of concrete walls without mesh | sq.m | 250 |
| 4 | Plastering of concrete walls with mesh | sq.m | 300 |
| 5 | Plastering of non-planar walls (semicircular, elliptical and other shapes) | sq.m - lin.m | 450 |
| 6 | Plastering of ceilings up to 3 cm | sq.m | 350 |
| 7 | Plastering of ceilings from 3 cm (on guides) | sq.m | 420 |
| 8 | Plastering of walls off a straightedge | sq.m | 280 |
| 9 | Partial leveling of walls with Rotband mortar | sq.m | 300 |
| 10 | Partial leveling of the ceiling with Rotband mortar | sq.m | 380 |
| 11 | Sealing of chases with gypsum mortar | lin.m | 160 |
| 12 | Plastering of reveals | lin.m | 300 |
| 13 | Installation of metal mesh for plastering | lin.m | 80 |
| 14 | Installation of a perforated corner bead | lin.m | 100 |
| 15 | Installation of serpyanka painting mesh for filling | lin.m | 70 |
| 16 | Installation of spider-web painting mesh for filling | sq.m | 140 |
| 17 | Wall filling (coat) | sq.m | 70 |
| 18 | Ceiling filling | sq.m | 100 |
| 19 | Sanding of a filled surface | sq.m | 40 |
| 20 | Priming of walls and ceilings | sq.m | 30 |
| 21 | Painting of walls in 2 coats | sq.m | 160 |
| 22 | Painting of walls with oil paint | sq.m | 220 |
| 23 | Painting of ceilings in 2 coats | sq.m | 180 |
| 24 | Painting of window and door reveals in 2 coats | lin.m | 140 |
| 25 | Painting of door units, window frames, window sills | sq.m | 300 |
| 26 | Painting of wallpaper | sq.m - lin.m | 160 |
| 27 | Painting of radiators | sq.m - lin.m | 500 |
| 28 | Painting of pipes | lin.m | 200 |
| 29 | Painting of metal fences and grilles | sq.m - lin.m | 180 |
| 30 | Painting of polyurethane linear moldings (stucco) | lin.m | 200 |
| 31 | Painting of polyurethane ceiling roses (stucco) | pcs | 500 |
| 32 | Crackled painting of polyurethane linear moldings (stucco) | lin.m | 250 |
| 33 | Crackled painting of polyurethane ceiling roses (stucco) | sq.m | 550 |
| 34 | Wallpapering walls with simple and medium-density wallpaper | sq.m | 150 |
| 35 | Wallpapering walls with textile wallpaper | sq.m | 450 |
| 36 | Wallpapering walls with glass-fiber wallpaper | sq.m | 120 |
| 37 | Applying a fresco to the wall | sq.m | 1000-5000 |
| 38 | Wallpapering walls with photo wallpaper or scenic wallpaper | sq.m | 500-2000 |
| 39 | Applying a border | lin.m | 140 |
| 40 | Installation of gypsum linear moldings | lin.m | 600 |
| 41 | Installation of polyurethane linear moldings | lin.m | 300 |
| 42 | Installation of gypsum and polyurethane ceiling roses | pcs | 600-1200 |
| 43 | Decorative painting | sq.m | 600 |
| 44 | Decorative plaster | sq.m | 700 |
| 45 | Venetian plaster | sq.m | 800 |
| 46 | Decorative plaster | sq.m | 1200-4000 |
| Tiling works | |||
| 1 | Wall leveling for tile installation (with plaster mortar) | sq.m | 300 |
| 2 | Floor tile installation | sq.m | 600 |
| 3 | Granite tile floor installation | sq.m | 800 |
| 4 | Diagonal floor tile installation | sq.m | 650 |
| 5 | Cladding of columns and reveals with ceramic tile | lin.m | 800 |
| 6 | Wall cladding with reinforced tile panels | sq.m | 600 |
| 7 | Mosaic installation | sq.m - lin.m | 1200-3000 |
| 8 | Frieze installation | lin.m | 350 |
| 9 | Tile cladding of treads, risers, and stairs | lin.m | 700 |
| 10 | Drilling holes in tile | 1 pc. | 200 |
| 11 | Installation of soap dishes, shelves, hooks, etc. | point | 250 |
| 12 | Wall tiling | sq.m - lin.m | 650 |
| 13 | Wall tiling (5*5 and 10*10) | sq.m - lin.m | 750 |
| 14 | Kitchen backsplash tiling | sq.m | 900 |
| 15 | Shaped tile cutting | sq.m - lin.m | 1200 |
| 16 | 45° miter cut of ceramic tile edges | lin.m | 400 |
| 17 | Fabrication of tile thresholds | lin.m | 1000 |
| Carpentry works | |||
| 1 | Installation of a metal entrance door | pc. | 4000 |
| 2 | Standard installation of single-leaf doors (from 2 pcs.) | pc. | 2000 |
| 3 | Standard installation of a double-leaf door | pc. | 3000 |
| 4 | Installation of door jamb extensions | lin.m | 400 |
| 5 | Mortise locks | pc. | 600 |
| 6 | Door trimming | pc. | 400 |
| 7 | Installation of door casings | lin.m | 180 |
| 8 | Installation of decorative and protective corner profiles | lin.m | 250 |
| 9 | Cutting casings to length | lin.m | 80 |
| 10 | Installation of a door unit (standard opening) | point | 1800 |
| 11 | Installation of corner profiles | lin.m | 400 |
| 12 | Installation of a door stop | point | 300 |
| 13 | Installation of a door closer | point | 500 |
| 14 | Installation of a portal (arches) | lin.m | 800 |
| 15 | Fitting a barrel bolt | pc. | 200 |
| 16 | Fitting a latch | pc. | 200 |
| 17 | Sanding and varnishing of door leaves and frames | sq.m | 800 |
| Plumbing works | |||
| Heating | |||
| 1 | Installation of heating appliances | location | 2000 |
| 2 | Boiler piping | pc. | 4000-8000 |
| 3 | Installation of an expansion tank | pc. | 2200 |
| 4 | Installation of pipe routing | lin.m | 120 |
| 5 | Installation of shut-off valves | pc. | 140 |
| 6 | System start-up | system | 2500 |
| Water supply, sewage | |||
| 1 | Chasing grooves for pipe connections | lin.m | 180 |
| 2 | Water supply installation | lin.m | 240 |
| 2 | Installation of flexible hoses | pc. | 260 |
| 3 | Toilet installation | pc. | 2000 |
| 4 | Sink installation | pc. | 2000 |
| 5 | Installation of a vanity unit (“Moydodyr”) | pc. | 1800 |
| 7 | Faucet installation | pc. | 1000-2500 |
| 8 | Bathtub installation | pc. | 2000 |
| 9 | Bath screen installation | pc. | 1000 |
| 10 | Whirlpool bathtub installation | pc. | 4000 |
| 11 | Shower cabin installation | pc. | 3000 |
| 12 | Towel rail installation | pc. | 1800 |
| 13 | Shower tray installation | pc. | 2000 |
| 14 | PVC sewage installation 50 mm | lin.m | 350 |
| 15 | PVC sewage installation 100 mm | lin.m | 400 |
| 16 | Cast-iron sewage installation 50 mm | lin.m | 400 |
| 17 | Cast-iron sewage installation 100 mm | lin.m | 500 |
| 18 | Tapping water supply into an existing network | tap-in | 1200 |
| 19 | Tapping sewage into an existing network | tap-in | 1500 |
| 20 | Water heater installation | pc. | 2500 |
| 21 | System start-up | point | 1000 |
| Electrical installation works | |||
| 1 | Installation of a surface-mounted switch or outlet | pc. | 300 |
| 2 | Installation of a switch or outlet | pc. | 250 |
| 3 | Chasing and installation of a back box in gypsum, asbestos cement, foam block, tongue-and-groove | pc. | 300 |
| 4 | Chasing and installation of a back box in brick | pc. | 350 |
| 5 | Chasing and installation of a back box in concrete | pc. | 400 |
| 6 | Installation of spotlights, transformers, doorbells, wall lights, etc. | pc. | 300 |
| 7 | Chandelier installation | pc | 500-1500 |
| 8 | Installation of surface-mounted junction boxes | pc. | 400 |
| 9 | Installation of flush junction boxes | pc. | 500 |
| 10 | Chasing for wiring in gypsum, asbestos cement, foam block, tongue-and-groove | lin.m | 150 |
| 11 | Chasing for wiring in brick | lin.m | 180 |
| 12 | Chasing for wiring in concrete | lin.m | 240 |
| 13 | Chasing for wiring in conduit in gypsum, asbestos cement, foam block, tongue-and-groove | lin.m | 180 |
| 14 | Chasing for wiring in conduit in brick | lin.m | 175 |
| 15 | Chasing for wiring in conduit in concrete | lin.m | 280 |
| 16 | Filling of electrical chases | lin.m | 100 |
| 17 | Cable laying | lin.m | 60 |
| 18 | Cable laying in conduit | lin.m | 100 |
| 19 | Installation of an electrical box up to 12 circuits (flush +50%) | pc. | 2500 |
| 20 | Installation of an electrical box up to 18 circuits (flush +50%) | pc. | 3500 |
| 21 | Installation of an electrical box up to 24 circuits (flush +50%) | pc. | 4200 |
| 22 | Installation of a 1-pole circuit breaker (in the box) | pc. | 400 |
| 23 | Installation of a 2-pole circuit breaker (in the box) | pc. | 550 |
| 24 | Installation of a 3-pole circuit breaker (in the box) | pc. | 800 |
| 25 | Installation of an RCD (in the box) | pc. | 700 |
| 26 | Installation of an L1 meter | pc. | 1500 |
| 27 | Installation of an L1.L2.L3. meter | pc. | 2200 |
| 28 | Fan installation | pc. | 500 |
| 29 | Laying corrugated pipe for exhaust hood | lin. m | 350 |
| 30 | Installation of underfloor heating thermostat | pc. | 600 |
| 31 | Installation of electric underfloor heating | sq. m | 400 |
| Cleaning and handover of the premises | |||
| Protection of windows, doors, and floors with polyethylene | sq. m | 60 | |
| Lifting plaster mortar (per floor) | pc | 20 | |
| Manual mixing of plaster mortar | m³ | 1800 | |
| Lifting gypsum boards (GKL, GKLW) to the site | sheet/floor | 25 | |
| Removal and haulage of debris (up to 1.5 t) | truck | 5000 | |
Slopes, levels, niches, columns, contours, complex spatial structures and curved sections are calculated as linear meters. Surfaces less than 60 cm wide are calculated as linear meters.
Preparatory works, loading and unloading, workplace setup, site access, scaffolding, water and electricity supply, moving and dismantling furnishings, cleaning, and waste removal and haulage are accounted for separately as overheads and amount to at least 10% of the estimated cost.
Rates are given for a scope of work of at least 100 sq.m / lin.m.