Sample major renovation estimate

4/9/2017

Appendix 1

       

Estimate

Works takeoff (stage 1)

       

Item

Unit

Qty

Price (RUB)

Amount

Backfilling expanded clay under the screed, with leveling

m2

9.6

120

1152

Installing reinforcing mesh (for cement screed)

m2

9.6

70

672

Cement screed thicker than 25 mm

m2

9.6

250

2400

Embedding heating pipes in cement screed (with reinforcement)

lin. m

53

300

15900

Building brick partitions with reinforcement

m2

19

500

9500

Plastering brickwork up to 3 cm (reveal)

lin. m

8.5

320

2720

Filling chases with gypsum mortar

lin. m

112

100

11200

Filling openings (heating) with plaster mortar

pcs

16

250

4000

 Plastering reveals

lin. m

24

280

6720

Installing perforated corner bead

lin. m

98

80

7840

Partial wall leveling with Rotband mortar  (50% of wall area)

m2

150

260

39000

Floor leveling (self-leveling compound)

m2

72

200

Wall leveling for tile (plaster mortar) 50%

m2

20

220

4400

Subtotal

*

*

*

105504

Overheads 10%

pcs

1

10500

10500

Total  for all works

116004

Materials takeoff (stage 1)

       

Item

Unit

Qty

Price (RUB)

Amount

Expanded clay (fraction 5–20)

m3

1

2500

2500

Plastering beads

pcs

12

30

360

Construction mesh 25×25, 3×500×2000 mm*

pcs

25

130

3250

Ivsil M-150 universal dry mix, 50 kg

pcs

20

200

4000

Optimist universal primer, 10 l

pcs

12

360

4320

Volma Sloy plaster, 30 kg

pcs

7

300

2100

Perforated corner profile /25*25/, 3 m, galvanized

pcs

58

30

1740

Rotband gypsum plaster  30 kg

pcs

30

340

10200

Ivsil Tie-Rod-2 self-leveling mix, 25 kg

pcs

50

370

subtotal

*

*

*

28470

Consumables 10%

pcs

1

2800

2800

Transport (overheads) 10%

pcs

1

2800

2800

Total  for all materials

34070

Stage 1 total  150300

Materials takeoff (stage 2)

       

Item

Unit

Qty

Price (RUB)

Amount

Moisture-resistant gypsum board GKLV 2500×1200×12.5 mm

pcs

14

370

5180

 Standard gypsum board GKL  2500×1200×12.5 mm

pcs

42

305

12810

Guide profile UW /100*40/, 3 m

pcs

4

200

800

Guide profile UW /27*28/, 3 m

pcs

44

95

4180

Stud profile CW /100*50/, 3 m

pcs

7

220

1540

Ceiling profile CD /60*27/, 3 m

pcs

56

130

7280

Direct hanger with tabs

pcs

250

4

1000

Nail-in anchor 6x40 mm

pcs

1000

0.72

720

Gypsum-fiber screws 3.9*19 mm

pcs

1500

0.18

270

Self-tapping screws 4.2*13 mm, zinc

pcs

2000

0.23

460

URSA M-11/100 insulation (12 m2 roll)

pcs

5

1920

9600

Acoustic insulation material

m2

9

350

3150

Joint tape  45 mm*90 m

pcs

7

105

735

Euro-L filler, 15 kg

pcs

46

200

9200

Masking tape, 50 m

pcs

6

70

420

Fugenfüller gypsum plaster, 30 kg

pcs

4

340

1360

KNAUF Perlfix adhesive, 30 kg

pcs

12

315

3780

subtotal

*

*

*

62485

Consumables 5%

pcs

1

3100

3100

Transport (overheads) 5%

pcs

1

3100

3100

Total  for all materials

68685

Stage 2 total  197985

Works takeoff ( stage 3)

       

Floor leveling (self-leveling compound)

m2

102

200

20400

Ceiling insulation

m2

10

150

1500

Ceramic floor tile on prepared surface, adhesive-laid with grouting

m2

37

500

18500

Wall tiling

m2

43

500

21500

Tiling columns, reveals and steps with ceramic tile

lin. m

14

700

9800

Kitchen backsplash tiling

m2

5

800

4000

Ceramic frieze (skirting) installation

lin. m

20

250

5000

Drilling holes in tile

pcs

10

70

700

Cutting tile openings for access panels

pcs

4

150

600

Subtotal 

*

*

*

82000

Overheads 10%

pcs

1

8200

8200

Total  for all works

90200

Materials takeoff (stage 3)

       

Ivsil Tie-Rod-2 self-leveling mix, 25 kg

pcs

72

370

26640

Unis 2000 tile adhesive, 25 kg

pcs

34

250

8500

Tile spacers 2.5 mm, 200 pcs

pcs

8

50

400

Floor tile (porcelain stoneware) 40*40

m2

42

1000

42000

Kerama Marazzi wall tile

m2

65

1000

65000

Ceresit grout, 2 kg

pcs

16

120

1920

Tile trims (external/internal), 2.7 m

pcs

16

110

1760

subtotal

*

*

*

146220

Consumables 5%

pcs

1

7300

7300

Transport (overheads) 5%

pcs

1

7300

7300

Total  for all materials

160820

Stage 2 total  251020

Works takeoff (stage 4)

       

Engineered parquet board installation

m2

107

350

37450

Skirting installation (hardwood)

lin. m

118

120

14160

Threshold installation

lin. m

14

120

1680

Decorative MDF wall panels on framing

m2

42

280

11760

Installing ventilation grilles and access panels (bathroom, built-in cabinet)

pcs

12

150

1800

Slat / panel bathroom ceiling with cut-outs for downlights

m2

9.5

500

4750

Wallpapering walls, plain and medium-weight papers

m2

312

120

37440

Painting wallpaper

m2

312

100

31200

Installing a metal entrance door with frame

pcs

1

3500

3500

Standard installation of single-leaf doors

pcs

8

1600

12800

Installing door jamb extensions

lin. m

26

400

10400

Installing architraves

lin. m

42

100

4200

Lock mortising

pcs

9

400

3600

Stretch ceiling installation

m2

115

400

46000

Subtotal 

*

*

*

220740

Overheads 5%

pcs

1

11440

11440

Total  for all works

232180

Materials takeoff (stage 4)

       

Item

Unit

Qty

Price (RUB)

Amount

Foam underlay, 10 mm thick

m2

107

40

4280

Transition threshold (decorative)

pcs

12

250

3000

Guide profile UW /27*28/, 3 m

pcs

18

95

1710

Ceiling profile CD /60*27/, 3 m

pcs

38

130

4940

Direct hanger with tabs

pcs

100

4

400

Nail-in anchor 6x40 mm

pcs

500

0.72

360

Self-tapping screws 4.2*13 mm, zinc

pcs

800

0.23

184

Ventilation grille, access hatch

pcs

12

200

2400

Wellton Cascade WD710 glass-fiber wallpaper, 1st grade, 12.5 m2

pcs

30

1320

39600

KLEO ULTRA adhesive for glass-fiber, non-woven, textile and vinyl wallpapers, 500 g

pcs

7

310

2170

Dulux Easy matt water-borne paint for wallpaper and walls, 10 l

pcs

5

2250

11250

Paint tinter, 0.75 l

pcs

10

250

2500

Engineered parquet board

m2

107

1000

107000

MDF panels

pcs

42

250

10500

Metal entrance door

pcs

1

20000

20000

Interior doors + hardware

pcs

8

10000

80000

Stretch ceiling + accessories

m2

115

400

46000

Ceiling slats + accessories

m2

9.5

350

3325

subtotal

*

*

*

339619

Consumables 5%

pcs

1

17400

17400

Transport (overheads) 5%

pcs

1

17400

17400

Total  for all materials

374419

Stage 3 total  606600

         

Total for all work stages

525840

 

 

 

Total for all materials

576794

 

 

 

Total additional costs

98500

 

 

 

         

GRAND TOTAL FOR ALL WORKS AND MATERIALS

1,201,100 RUB

Total apartment area 144 m2

       

1 m2 of finishing works + materials = 8340 RUB

       

Client

Contractor

______________________